North Homes is your Partner in building your home. As your Partner, we can complete all of the Lot Developments to your lot.  So often, other homebuilders leave the  responsibility of Lot Developments to the homeowner.

We can completely manage your Lot Developments and can add them into your Construction Agreement, saving you time and trouble.

If you need help finding a lot, let us know, we can help.

Building Commitment=
Home Cost
+
Land Cost
+
Lot Development costs
= Total Investment

Average Lot Development Costs to a Developed Lot
(Developed Lots generally have city utilities)

Building Permit                                      $200 - $500
House Staking/Plot Plan/Septic Design                $750
Water Permit/Tap Fee                                 $200 - $2000
Temporary Construction Drive @ $8-$9 Per Linear Foot $400 - $800
Temporary Electric Pole installation+removal         $250
Backfilling Crawlspace Home                          $400
Backfilling Basement Home                            $900
Rough Grading Jobsite                                $400
Exterior Concrete  @ $3.00 - $3.50 per square foot  $3000
Connection to City Water                             $600 - $1000
Sewer Tap Fee                                        $0 - $3000
Connection to Sanitary Sewer                         $800 -$1300
Final Grade, Straw and Seed
  @ $.07 - $.09 per square foot                      $1500
Clean up and Dumpster Rental                         $1500

Average Lot Development Costs to an Undeveloped Lot
(Undeveloped Lots generally have septic and/or well requirements)

Building Permit                                      $200 - $500
Septic Permit                                        $100 - $200
Soil Test                                            $250
House Staking/Plot Plan/Septic Design                $750
Temporary Electric Pole installation+removal         $250
Well Permit                                          $100
Drainage Culverts                                    $500 - $600
Temporary Construction Drive @ $8-$9 Per Linear Foot $400 - $800
Backfilling Crawlspace Home                          $400
Backfilling Basement Home                            $900
Rough Grading jobsite                                $400
Exterior Concrete @ $3.00 - $3.50 per square foot    $3000
Well and Pump                                        $3600
Septic System                                        $5600 - $7500
Landscaping (Final Grade, Straw, and Seed)
  @ $.07 - $.09 per square foot                      $1500
Clean up and Dumpster Rental                         $1500

* Costs shown are estimates only.  Development costs can be different for each lot.  Estimates will be prepared on a lot by lot basis.
 