Average Lot Development Costs to a Developed Lot (Developed Lots generally have city utilities)
Building Permit $200 - $500 House Staking/Plot Plan/Septic Design $750 Water Permit/Tap Fee $200 - $2000 Temporary Construction Drive @ $8-$9 Per Linear Foot $400 - $800 Temporary Electric Pole installation+removal $250 Backfilling Crawlspace Home $400 Backfilling Basement Home $900 Rough Grading Jobsite $400 Exterior Concrete @ $3.00 - $3.50 per square foot $3000 Connection to City Water $600 - $1000 Sewer Tap Fee $0 - $3000 Connection to Sanitary Sewer $800 -$1300 Final Grade, Straw and Seed @ $.07 - $.09 per square foot $1500 Clean up and Dumpster Rental $1500
Average Lot Development Costs to an Undeveloped Lot (Undeveloped Lots generally have septic and/or well requirements)
Building Permit $200 - $500 Septic Permit $100 - $200 Soil Test $250 House Staking/Plot Plan/Septic Design $750 Temporary Electric Pole installation+removal $250 Well Permit $100 Drainage Culverts $500 - $600 Temporary Construction Drive @ $8-$9 Per Linear Foot $400 - $800 Backfilling Crawlspace Home $400 Backfilling Basement Home $900 Rough Grading jobsite $400 Exterior Concrete @ $3.00 - $3.50 per square foot $3000 Well and Pump $3600 Septic System $5600 - $7500 Landscaping (Final Grade, Straw, and Seed) @ $.07 - $.09 per square foot $1500 Clean up and Dumpster Rental $1500
* Costs shown are estimates only. Development costs can be different for each lot. Estimates will be prepared on a lot by lot basis. |